PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed steel angles at Stair -2-Elev. 4 (4th Floor) for the metal decking Facing South (800x600).jpg Installing steel angles at Elev. 5,6 (4th Floor) for the metal decking Facing North-East (800x600).jpg Intalling foam insulation and backfilling along column lines K-M Facing East (800x600).jpg Started cutting the beam pockets at Stair -4 (Roof) Facing North (800x600).jpg Started excavating for the water tie in connecting the Courthouse at Rahway Ave (800x600).jpg Derrick -7 (2nd Floor) Facing North-West  (800x600).jpg Excavation for the water tie in at Rahway Ave.  (800x600).jpg
Previous pageNext page Started excavating for the water tie in connecting the Courthouse at Rahway Ave (800x600)
Started excavating for the water tie in connecting the Courthouse at Rahway Ave (800x600)